TNC-WWF Joint Strategy for the Gulf of California (ID: 1535)
-
-
- Download Project
- See Associated Info (4)
Miradi FAQs.
Download Project
The datapack for this project cannot be downloaded. Please contact the project owner for more information
Associated Files
-
RC2.png
Size: 90.2 kB
Uploaded On: December 23, 2010 -
RC1.png
Size: 42.8 kB
Uploaded On: December 23, 2010 -
CM0.png
Size: 103.0 kB
Uploaded On: December 23, 2010 -
Climate Clinic Hypotheses of Change
Size: 105.0 kB
Uploaded On: October 30, 2009
icon beside the image name.
Associated Links
No associated links found.
| Name |
|---|
|
A1 : Estuaries1 : By 2020, estuaries at priority sites* in the GoC are ecologically functioning and at least support the same population levels of wetland birds, plants and fish and recruitment levels of marine invertebrate and vertebrate (shrimp, bivalves and snooks) than in 2009 (Target = Estuaries)
(more info)
|
|
A2 : Estuaries2 : By 2020, critical estuarian nursery habitat of (Anne create sp. list from Villavicencio 2000) shark and ray species are effectively conserved through fisheries management schemes such as seasonal closures, no-take zones or protected areas at priority sites. (Target = Estuaries)
(more info)
|
|
B1 : Shoreline1 : By 2020, the current surface area of rocky shoreline, sandy shoreline (including sea turtle beach nesting sites), mangroves, and non-mangrove wetlands -- at least maintained in their functional condition for supporting critical life habitat in selected priority shoreline sites as compared in 2009. (Target = Shoreline)
(more info)
|
|
C1 : Rocky reefs and rocky bottoms1 : By 2020, diversity and abundance of reef fish, lobsters, octopuses and sea cucumbers at reefs and rocky bottoms of priority sites are the same or have increased than in 2009* (Target = Rocky reefs and rocky bottoms)
(more info)
|
|
D : Migratory species1 : By 2020, all 2006* identified important critical life stage habitats (such as those for breeding, nesting and feeding) for migratory species are at least maintained. (Target = Migratory Species)
(more info)
|
|
E1 : Seamounts1 : By 2020, diversity and abundance of pelagic fish assemblages at seamounts associated to priority sites are the same than in 2009 (Target = Seamounts)
(more info)
|
|
F1 : Coastal Shallows and soft bottoms1 : By 2020, the diversity and abundance of representative* groups of fishes and demersal and benthic organisms of soft and shallow bottoms at priority sites of the GoC are maintained, in comparison with 2009 (?) baseline levels by ensuring ecological flow and the integrity of the soft bottom. (Target = Coastal shallows and Soft bottoms)
(more info)
|
|
F2 : Coastal Shallows and soft bottoms2 : By 2020, the vaquita is safe from extinction due to fisheries related threat (Target = Coastal shallows and Soft bottoms)
|
|
Net 3 : refined design of the functional network : Objective Net3. By 2010, the refined design of the functional network will incorporate ecological and social connectivity, environmental services, and information about global climate change.
|
|
Net 4 : key stakeholders understand the economic value of a functional network of conservation and management areas : Objective Net4. By 2012, key stakeholders understand the economic value of a functional network of conservation and management areas and the value of intact ecological systems.
|
|
Net 6 : Adequate legal tool effectively applied and a management plan : By 2015, at least 50% of the 54 priority sites have an adequate legal tool effectively applied.
|
|
Net10.1 : Communicate network strategy results to key internal and external audiences. : By 2020, TNC and WWF team are demonstrating effectiveness of the network strategy to key internal and external audiences.
|
|
Net10 : Monitoring the effectivenes of the network of conservation and mgmt areas : By 2015, conservation practitioners in the network are using monitoring data to measure their success at the site and multisite level, do adaptive management and improve the practices of conservation in at least 50% of the 54 priority sites.
|
|
Net11 : Priority sites are effectively managed. : By 2018, at least 50% of the priority sites are effectively managed.
|
|
Net12 : Reduction of unsustainable fisheries conditions : By 2020, 100% of all unsustainable fisheries conditions (free access, destructive practices, lack of organization) have been eliminated in at least 8 priority sites, and sustainable fisheries practices (selective and modern systems, organized operations, incentives and legal access to fisheries resources and fishing zones) have been adopted. (Threat = Unsustainable Artesanal Fishing)
|
|
Net13 : Reduction of unsustainable Industrial fisheries conditions : By 2020, the total volume of the industrial shrimp fleet of the Gulf of California has been reduced by 30% with respect to the 2007 volume (2,000 boats). (Threat = Unsustainable Industrial Fishing)
|
|
Net14 : Critical invasive species eliminated : By 2015, the most critical invasive species have been eliminated or reduced until acceptable ecological levels from at least 50% of priority islands in the Gulf (priority islands to be defined, based on species vulnerability, endemics, etc.). (Threat = Invasive Species (cats, dogs, rats))
|
|
Net1 : key partners participation : By December 2010, institutional collaboration and institutional agreements on conservation and management implementation strategies for the network have been reached.
|
|
Net2.1 : decision making tool developed : By May 2010, decision making tool is online and key users are familiar with it and have started to utilize it.
|
|
Net2 : Policy tools : By September 2009, all of the organizations collaborating on this initiative have a comprehensive understanding of the different conservation and management policy tools currently available in Mexican legislation and their applicability for the Gulf of California.
|
|
Net5 : Key partners and conservation practitioners BUY IN : By 2012, intersectorial collaboration/cooperation mechanisms have been established between the key stakeholders in order to ensure effective implementation of policy tool(s) at the 16 priority sites.
|
|
Net7 : Efective management plans enforced : By 2015, at least 50% of the 54 priority sites have a management plan (or appropriate rules for resource use) being implemented and enforced.
|
|
Net8 : no take zone declared : By 2015, at least 50% of the areas that should have a no-take zone status in the 54 priority sites are no-take zones (informal or formal)
|
|
Net9.1 : Institutional capacities : By 2015, at least 50% of the priority sites have a lead institution with adequate capacity to manage the site effectively.
|
|
Insular species - Nesting Bird1 : By 2020, nesting bird abundance and number of nesting sites at priority sites is the same than in 2009* (Target = Insular Species)
(more info)
|
|
Insular species - Nesting Bird2 : By 2020, the abundance of Myotis vivesi at priority sites is the same than in 2009*. (Target = Insular Species)
(more info)
|
| Focal Conservation Target | Target Type | Habitat Type |
|---|---|---|
|
Coastal shallows and Soft bottoms
(more info)
|
- | - |
|
Estuaries
(more info)
|
- | - |
|
G. Blue water systems
|
- | - |
|
H. Groundwater dependent wetlands (oases, springs, marshes, vernal pools)
|
- | - |
|
Insular Species
(more info)
|
- | - |
|
Migratory Species
(more info)
|
- | - |
|
Rocky reefs and rocky bottoms
(more info)
|
- | - |
|
Seamounts
(more info)
|
- | - |
|
Shoreline
(more info)
|
- | - |
| Threat (Common Taxonomy) * | Targets Threatened |
|---|---|
|
Unregulated Sportfishing (Biological Resource Use :: Fishing & Harvesting Aquatic Resources ) |
|
|
Climate Change (Climate Change & Severe Weather :: Habitat Shifting & Alteration ) |
|
|
Unregulated Urban & Tourism Development (Residential & Commercial Development :: Tourism & Recreation Areas ) |
|
|
Unsustainable Artesanal Fishing (Biological Resource Use :: Fishing & Harvesting Aquatic Resources ) |
|
|
Unsustainable Aquaculture (Biological Resource Use :: Fishing & Harvesting Aquatic Resources ) |
|
|
Altered freshwater environmental flows (quality, quantity, temporality) (Natural System Modifications :: Dams & Water Management/Use ) |
|
|
Invasive Species (cats, dogs, rats) (Invasive & Other Problematic Species & Genes :: Invasive Non-Native/Alien Species ) |
|
|
Unsustainable Industrial Fishing (Biological Resource Use :: Fishing & Harvesting Aquatic Resources ) |
|
* For information on the common taxonomy of threats, see http://conservationmeasures.org/CMP/IUCN/.
| Strategy (Common Taxonomy) | Threats Addressed |
|---|---|
|
2 : Conservation Sector Capacity Dev´t
( External Capacity Building :: Alliance & Partnership Development ) |
|
|
3 : Vaquita strategy
( Species Management :: Species Recovery ) |
|
|
4 : incentive-based Fisheries Policies
( Livelihood, Economic & Other Incentives :: Linked Enterprises & Livelihood Alternatives ) |
|
|
5 : Shrimp Initiative
( Species Management :: Species Management ) |
|
|
RC1 : Network of conservation & mgmt areas : Implementing a suite of conservation and management tools that ensures a comprehensive representation of the region's biodiversity, provides adequate connectivity for critical ecological processes, improves the health of the conservation targets and abates the region's principal threats will require five major steps: 1) Design of a functional network that incorporates ecological and social connectivity, environmental services, and information about global climate change; 2) Identification of the most appropriate conservation and management tools for each site in the network based on biological, economic, social and political criteria; 3) Achieving the endorsement of environmental and fisheries authorities and civil society for the network; 4) Ensuring efficient management, enforcement and long-term sustainability of the network of sites; and 5) Monitoring of the effectiveness of the network.
( External Capacity Building :: Alliance & Partnership Development ) |
|
|
Climate Change
( Land/Water Management :: Site/Area Management ) |
|
|
Freshwater
( Undefined :: Undefined ) |
|
|
Tourism & Coastal Dev't Strategy
( Law & Policy :: Private Sector Standards & Codes ) |
|
| Conservation Targets | Landscape Context | Condition | Size | Viability Rank | ||||
|---|---|---|---|---|---|---|---|---|
| Grade | Weight | Grade | Weight | Grade | Weight | |||
| 1 | Coastal shallows and Soft bottoms | - | 1.0 | - | 1.0 | - | 1.0 | - |
| 2 | Estuaries | Good | 1.0 | - | 1.0 | - | 1.0 | Good |
| 3 | G. Blue water systems | - | 1.0 | - | 1.0 | - | 1.0 | - |
| 4 | H. Groundwater dependent wetlands (oases, springs, marshes, vernal pools) | - | 1.0 | - | 1.0 | - | 1.0 | - |
| 5 | Insular Species | - | 1.0 | - | 1.0 | - | 1.0 | - |
| 6 | Migratory Species | - | 1.0 | - | 1.0 | - | 1.0 | - |
| 7 | Rocky reefs and rocky bottoms | - | 1.0 | - | 1.0 | - | 1.0 | - |
| 8 | Seamounts | - | 1.0 | - | 1.0 | - | 1.0 | - |
| 9 | Shoreline | - | 1.0 | - | 1.0 | - | 1.0 | - |
| Project Biodiversity Health Rank | Good | |||||||
Note:
|
Project-specific Threats (Common Taxonomy *) |
Coastal shallows and Soft bottoms | Estuaries | G. Blue water systems | H. Groundwater dependent wetlands (oases, springs, marshes, vernal pools) | Insular Species | Migratory Species | Rocky reefs and rocky bottoms | Seamounts | Shoreline | Overall Threat Rank |
|---|---|---|---|---|---|---|---|---|---|---|
| Unregulated Sportfishing (Fishing & Harvesting Aquatic Resources) |
- | - | - | - | - | - | High | High | - | High |
| Climate Change (Habitat Shifting & Alteration) |
High | High | - | - | Medium | High | Medium | Medium | Medium | High |
| Unregulated Urban & Tourism Development (Tourism & Recreation Areas) |
- | High | - | - | - | Medium | - | - | High | High |
| Unsustainable Artesanal Fishing (Fishing & Harvesting Aquatic Resources) |
High | High | - | - | - | Medium | High | Low | Low | High |
| Unsustainable Aquaculture (Fishing & Harvesting Aquatic Resources) |
Medium | Medium | - | - | - | Low | - | - | Medium | Medium |
| Altered freshwater environmental flows (quality, quantity, temporality) (Dams & Water Management/Use) |
Medium | Medium | - | - | - | Medium | - | - | Medium | Medium |
| Invasive Species (cats, dogs, rats) (Invasive Non-Native/Alien Species) |
- | - | - | - | High | - | - | - | - | Medium |
| Unsustainable Industrial Fishing (Fishing & Harvesting Aquatic Resources) |
High | - | - | - | - | Medium | - | Medium | Medium | Medium |
| Threat Status for Targets and Project | High | High | - | - | Medium | Medium | High | Medium | Medium | High |
| Conservation Target | Key Attribute (Category) |
Indicator | Current Indicator Measurement | Rating Comments: (Poor, Fair Good Very Good) |
Current Rating and Date | Desired Rating and Date |
|---|---|---|---|---|---|---|
| Estuaries |
KEA_A2:Physical Connectivity of river network(alteration from natural, fragmentation indices, pressure for increased storage, -includes groundwater interaction)
(Condition) |
Degree of fragmentation of entire river network in the basin from source to sea (basin, river channel and riparian scale) |
-
|
Poor:
-
Fair: - Good: - Very Good: - |
-
|
-
|
| Estuaries |
KEA_A1:Hydrologic regime, combined surface and groundwater regime
(Landscape Context) |
Seasonal distribution of hydrologic regime for characteristic river type |
-
|
Poor:
-
Fair: - Good: - Very Good: - |
Good
|
Very Good
Aug 14, 2009 |
| Estuaries |
KEA_A3: Estuarine faunal community, (elasmobranch nursery habitat, fish, shrimp, etc) trophic webs
(Landscape Context) |
changes in availability of suitable elasmobranch nursery habitat, changes in composition of estuarine dependent fish communities, shift in productivity of shrimp |
-
|
Poor:
-
Fair: - Good: - Very Good: - |
-
|
-
|
| Estuaries |
KEA_A4:Wetland bird community
1
(Landscape Context) |
Index of Biotic Integrity |
-
|
Poor:
-
Fair: - Good: - Very Good: - |
-
|
-
|
| G. Blue water systems |
KEA_G1: upwellings, temperature, acidity, surface wind stress
(Landscape Context) |
(indicator is biotic composition, whales presence, birds, etc,) |
-
|
Poor:
-
Fair: - Good: - Very Good: - |
-
|
-
|
| H. Groundwater dependent wetlands (oases, springs, marshes, vernal pools) |
KEA_H1: hydrologic regime
(Landscape Context) |
water level, magnitude of groundwater discharge, water chemistry-salts, presence absence of endemic species |
-
|
Poor:
-
Fair: - Good: - Very Good: - |
-
|
-
|
| Rocky reefs and rocky bottoms |
KEA_C1: reef fish community, trophic webs influenced by freshwater inflows
(Landscape Context) |
abundance, recruitment index and species diversity and compostion |
-
|
Poor:
-
Fair: - Good: - Very Good: - |
-
|
-
|
| Shoreline |
KEA_B1:Shoreline habitat
(Landscape Context) |
% area/shoreline length of unfragmented and type of native habitats, land cover change |
-
|
Poor:
-
Fair: - Good: - Very Good: - |
-
|
-
|
| Shoreline |
KEA_B2: species composition
(Landscape Context) |
presence/absence abundance, ratios of mangrove species |
-
|
Poor:
-
Fair: - Good: - Very Good: - |
-
|
-
|
| Shoreline |
KEA_B3: Erosion and rate of deposition regime, tidal range, periodicity, sediment accretion rate, slope, substrate
(Landscape Context) |
slope, substrate, landuse behind mangroves and hydrologic flows |
-
|
Poor:
-
Fair: - Good: - Very Good: - |
-
|
-
|
| Shoreline |
KEA_B4: beach physical characteristics-dimension and configuration, temperature, erosion, deposition
(Landscape Context) |
dimensions (length, width from high tide mark and elevation) and configuration (slope and aspect) of areal extent and landuse behind beaches |
-
|
Poor:
-
Fair: - Good: - Very Good: - |
-
|
-
|
- Show all:
-
Strategic Action: RC1: Network of conservation & mgmt areas: Implementing a suite of conservation and management tools that ensures a comprehensive representation of the region's biodiversity, provides adequate connectivity for critical ecological processes, improves the health of the conservation targets and abates the region's principal threats will require five major steps: 1) Design of a functional network that incorporates ecological and social connectivity, environmental services, and information about global climate change; 2) Identification of the most appropriate conservation and management tools for each site in the network based on biological, economic, social and political criteria; 3) Achieving the endorsement of environmental and fisheries authorities and civil society for the network; 4) Ensuring efficient management, enforcement and long-term sustainability of the network of sites; and 5) Monitoring of the effectiveness of the network.
(measures info)
Progress Updated Comments On Track - El equipo de TNC y WWF han recaudado fondos para implementar las acciones planeadas para el 2009 y 2010. Se cunetan con responsable sy se estan cumpliendo con las tareas asignadas y productos. - Action Step:
Act Net1.1 Convene a meeting with key partners to agree to work or expand their work into the sites prioritized in the first iteration of the network of conservation and managed areas (2008).
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2008-05-22 - 2008-05-22 Who Override was: DB Diana Bermudez, SC Steve Cox --------------------------------------------------- Convene a meeting with key partners to agree to work or expand their work into the sites prioritized in the first iteration of the network of conservation and managed areas (2008).
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net1.2. Identify and meet with other key actors in the region to align current and future conservation and management strategies and to reach institutional agreements in support of the network of areas (2009).
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 0.0 When Override was: 2009-07-22 - 2009-12-23 Who Override was: DB Diana Bermudez, SC Steve Cox --------------------------------------------------- • Identify and meet with other key actors in the region to align current and future conservation and management strategies and to reach institutional agreements in support of the network of areas (2009).
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
ActNet1.3 Develop a communication strategy and outreach campaign that promotes the importance of the network strategy for engaging key stakeholders using scientific arguments (2010)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2009-12-23 Who Override was: DC Diana Crespo --------------------------------------------------- Develop a communication strategy and outreach campaign that promotes the importance of the network strategy for engaging key stakeholders using scientific arguments (2010)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net1.4 Establish collaboration agreements with key NGOs and institutions working at the site or regional level. Collaboration agreement will define clear objectives, goals, as well as roles and responsabilities that will facilitate the implementation of the network of areas (2010)
(comments)
(measures info)
Comment: Establish collaboration agreements with key NGOs and institutions working at the site or regional level. Collaboration agreement will define clear objectives, goals, as well as roles and responsabilities that will facilitate the implementation of the network of areas (2010)
Progress Updated Comments Planned - - - Action Step:
Act Net2.1 Develop a descriptive document and taxonomy of the conservation and management strategies that currently exist in Mexican legislation (2009)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 60000.0 When Override was: 2009-07-22 - 2010-07-22 Who Override was: ES Enrique Sanjurjo --------------------------------------------------- Develop a descriptive document and taxonomy of the conservation and management strategies that currently exist in Mexican legislation (2009)
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net2.2 Characterize and evaluate the benefits, limitations and feasibility (biological, social, political and economic) of the conservation and management policy tools (2009).
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 20000.0 When Override was: 2009-07-22 - 2010-07-22 Who Override was: ES Enrique Sanjurjo --------------------------------------------------- Characterize and evaluate the benefits, limitations and feasibility (biological, social, political and economic) of the conservation and management policy tools (2009).
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net 2.3 Build databases of network attributes (fichas) to link to a legal tool database (jun 09).
(comments)
Comment: Build databases of network attributes (fichas) to link to a legal tool database (jun 09).
- Action Step:
Act Net 2.4 Build decision tree model and online platform (dec 09)
(comments)
Comment: Build decision tree model and online platform (dec 09)
- Action Step:
Act net2.5. Characterization of attributes of policy instruments (sept 09)
(comments)
Comment: Characterization of attributes of policy instruments (sept 09)
- Action Step:
Act Net2.6 Validate functionality of decision making tool with key users (Dec 09)
(comments)
Comment: Validate functionality of decision making tool with key users (Dec 09)
- Action Step:
Act Net2.7 Finalize the development of a decision making tool to assist the identification of appropriate and feasible policy instruments for each site identified in the conservation and management area network (2010)
(comments)
Comment: Finalize the development of a decision making tool to assist the identification of appropriate and feasible policy instruments for each site identified in the conservation and management area network (2010)
- Action Step:
Act Net3.1 Complete prioritization analysis (2008)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2009-07-22 Who Override was: AG Anne Gondor --------------------------------------------------- Complete prioritization analysis (2008)
Progress Updated Comments Completed Jul 22, 2009 - - Action Step:
Act Net3.2 Complete study of ecological connectivity (2009)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 25000.0 When Override was: 2009-07-22 - 2010-07-22 Who Override was: AG Anne Gondor --------------------------------------------------- Complete study of ecological connectivity (2009)
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net3.3 Compile information on social connectivity (Nov 2009)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 30000.0 When Override was: 2009-07-22 - 2010-07-22 Who Override was: AG Anne Gondor --------------------------------------------------- Compile information on social connectivity (Nov 2009)
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net3.4 Compile information on environmental services generated by the GOC (Feb 2010)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 20000.0 When Override was: 2009-07-22 - 2010-06-22 Who Override was: ES Enrique Sanjurjo --------------------------------------------------- Compile information on environmental services generated by the GOC (Feb 2010)
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net3.5 Complete vulnerability assessment of climate change in the GOC and incorporate into the design of the network (Dec 2009).
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2009-12-23 Who Override was: AG Anne Gondor --------------------------------------------------- Complete vulnerability assessment of climate change in the GOC and incorporate into the design of the network (Dec 2009).
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net3.6 Build databases of compiled information of network attributes (fichas) for decision making tool (June 2009)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2009-07-22 Who Override was: AG Anne Gondor --------------------------------------------------- Build databases of compiled information of network attributes (fichas) for decision making tool (June 2009)
Progress Updated Comments Completed Jul 22, 2009 - - Action Step:
Act Net3.7 Integrate preliminary subregional results of ecological and social connectivity, environmental services and climate change vulnerability assessment into network attribute database (Feb 2010).
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2009-07-22 Who Override was: ES Enrique Sanjurjo --------------------------------------------------- Integrate preliminary subregional results of ecological and social connectivity, environmental services and climate change vulnerability assessment into network attribute database (Feb 2010).
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net4.1 Develop a study that estimates the economic value of functional connectivity between mangroves and adjacent ecosystems (2009-2010)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 79000.0 When Override was: 2009-07-22 - 2010-07-22 Who Override was: --------------------------------------------------- Develop a study that estimates the economic value of functional connectivity between mangroves and adjacent ecosystems (2009-2010)
Progress Updated Comments On Track Jul 22, 2009 aburto - Action Step:
Act Net4.2 Develop a study that estimates the economic value of the network (2010-2012)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2010-07-22 Who Override was: ES Enrique Sanjurjo --------------------------------------------------- Develop a study that estimates the economic value of the network (2010-2012)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net 5.1 Identify institution(s) that has the adequate capacity to lead process to define implementation of the most appropriate conservation and management tool(s) for each site in the network.
(comments)
Comment: Identify institution(s) that has the adequate capacity to lead process to define implementation of the most appropriate conservation and management tool(s) for each site in the network.
- Action Step:
Act Net 5.2 Develop work plans for each site in the network that clearly guides the implementation of the conservation and management tool(s) - objectives, activites, roles and responsibilities, monitoring plan, timelines and budget.
(comments)
Comment: Develop work plans for each site in the network that clearly guides the implementation of the conservation and management tool(s) - objectives, activites, roles and responsibilities, monitoring plan, timelines and budget.
- Action Step:
Act Net 5.3 Identify fundraising strategy to ensure implementation of the conservation and management tool(s)
(comments)
Comment: Identify fundraising strategy to ensure implementation of the conservation and management tool(s)
- Action Step:
Act Net 6.1 With key government agencies and NGOs, run the decision making model to determine which conservation and management policy tools are most appropriate and feasible for each site identified in the network of areas (2010)
(comments)
(measures info)
Comment: With key government agencies and NGOs, run the decision making model to determine which conservation and management policy tools are most appropriate and feasible for each site identified in the network of areas (2010)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net6.2 Develop a policy agenda to promote and create new legal instruments for conservation and management (2009)
(comments)
(measures info)
Comment: Develop a policy agenda to promote and create new legal instruments for conservation and management (2009)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net 6.3 Support the development of justification studies for new conservation and management areas, and lobby for their legal status (2008-2015)
(comments)
(measures info)
Comment: Support the development of justification studies for new conservation and management areas, and lobby for their legal status (2008-2015)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net 6.4 Support the development of land use zoning instruments (2008-2015)
(comments)
(measures info)
Comment: Support the development of land use zoning instruments (2008-2015)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net 6.5 Conduct an evaluation of current fisheries management capacity in the Gulf (2010)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2010-07-24 - 2010-07-24 Who Override was: --------------------------------------------------- Conduct an evaluation of current fisheries management capacity in the Gulf (2010)
Progress Updated Comments Planned Jul 23, 2009 - Planned Jul 22, 2009 - - Action Step:
Act net 6.6 Support the development of fisheries management plans (2009-2015)
(comments)
(measures info)
Comment: Support the development of fisheries management plans (2009-2015)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Actividad Net7.1 Identify alternatives for establishing no-take zones other than CONAPESCA formal decree (2010)
(comments)
(measures info)
Comment: Identify alternatives for establishing no-take zones other than CONAPESCA formal decree (2010)
Progress Updated Comments Planned - - - Action Step:
Actividad Net 7.2 Support COBI and other local NGOs in the establishment of no-take zones in areas that should have a no-take zone status in the network of 54 priority sites ·
(comments)
(measures info)
Comment: Support COBI and other local NGOs in the establishment of no-take zones in areas that should have a no-take zone status in the network of 54 priority sites ·
Progress Updated Comments Planned - - - Action Step:
Actividad Net 7.3 Support INAPESCA for validating the technical justifications for the decree of no-take zones by CONAPESCA
(comments)
(measures info)
Comment: Support INAPESCA for validating the technical justifications for the decree of no-take zones by CONAPESCA
Progress Updated Comments Planned - - - Action Step:
Actividad Net8.1 Carryout scoping exercise that identifies innovative financial strategy (2009).
(comments)
(measures info)
Comment: Carryout scoping exercise that identifies innovative financial strategy (2009).
Progress Updated Comments Planned - - - Action Step:
Actividad Net 8.2 Develop a financial plan for the entire network of areas (2010-2012)
(comments)
(measures info)
Comment: Develop a financial plan for the entire network of areas (2010-2012)
Progress Updated Comments Planned - - - Action Step:
Actividad net 8.3 Fundraise for the management of the network of areas (2009-2015)
(comments)
(measures info)
Comment: Fundraise for the management of the network of areas (2009-2015)
Progress Updated Comments Planned - - - Action Step:
Actividad Net9a.1 Carryout scoping exercise that identifies innovative financial strategy (2009). ·
(comments)
(measures info)
Comment: Carryout scoping exercise that identifies innovative financial strategy (2009). ·
Progress Updated Comments Planned - - - Action Step:
Actividad 9a.2 Develop a financial plan for the entire network of areas (2010-2012) ·
(comments)
(measures info)
Comment: Develop a financial plan for the entire network of areas (2010-2012) ·
Progress Updated Comments Planned - - - Action Step:
Actividad Net9a.3 Fundraise for the management of the network of areas (2009-2015)
(comments)
(measures info)
Comment: Fundraise for the management of the network of areas (2009-2015)
Progress Updated Comments Planned - - - Action Step:
Actividad Net9b.1 Analyze current evaluations of management effectiveness of existing MPAs in the Gulf of California and generate a roadmap on how MPA management can be improved working in conjunction with CONANP and conservation NGOs (2008)
(comments)
(measures info)
Comment: Analyze current evaluations of management effectiveness of existing MPAs in the Gulf of California and generate a roadmap on how MPA management can be improved working in conjunction with CONANP and conservation NGOs (2008)
Progress Updated Comments Planned - - - Action Step:
Actividad Netb.2 Together with NOAA, design and implement a management capacity building program for MPA managers in the Gulf of California (2009-2011)
(comments)
(measures info)
Comment: Together with NOAA, design and implement a management capacity building program for MPA managers in the Gulf of California (2009-2011)
Progress Updated Comments Planned - - - Action Step:
Actividad Net9b.3 Support the development of site financial plans (2011-2015)
(comments)
(measures info)
Comment: Support the development of site financial plans (2011-2015)
Progress Updated Comments Planned - - - Action Step:
Actividad Net9b.4 Hire an institutional development specialist to strengthen the capacities of local conservation NGOs and government agencies (2009)
(comments)
(measures info)
Comment: Hire an institutional development specialist to strengthen the capacities of local conservation NGOs and government agencies (2009)
Progress Updated Comments Planned - - - Action Step:
Actividad Net 10 Identify existing monitoring efforts, as well as monitoring gaps.
(comments)
Comment: Identify existing monitoring efforts, as well as monitoring gaps.
- Action Step:
Act Net 10.1 Promote the importance of status and effectiveness measures by establishing a learning network among conservation practioners.
(comments)
Comment: Promote the importance of status and effectiveness measures by establishing a learning network among conservation practioners.
- Action Step:
Act Net 10.2 Build capacity among conservation practitioners in order to ensure that they have the knowledge and tools needed to establish measures of success and do adaptive management.
(comments)
Comment: Build capacity among conservation practitioners in order to ensure that they have the knowledge and tools needed to establish measures of success and do adaptive management.
- Action Step:
Act Net 10.3 Standardize monitoring protocols that will allow data comparison and assessing the conservation effectiveness of conservation and management areas in the Gulf of California.
(comments)
Comment: Standardize monitoring protocols that will allow data comparison and assessing the conservation effectiveness of conservation and management areas in the Gulf of California.
- Action Step:
Act Net 10.4 Establish collaboration agreements and coordination mechanisms with key institutions in order to establish a functional monitoring network that measures success at the regional level.
(comments)
Comment: Establish collaboration agreements and coordination mechanisms with key institutions in order to establish a functional monitoring network that measures success at the regional level.
- Action Step:
Act Net 10.5 Report how well strategies and actions are achieving the desired results in order to enhance accountability, credibility and transparency internally and externally.
(comments)
Comment: Report how well strategies and actions are achieving the desired results in order to enhance accountability, credibility and transparency internally and externally.
- Action Step:
Act Net1.1 Convene a meeting with key partners to agree to work or expand their work into the sites prioritized in the first iteration of the network of conservation and managed areas (2008).
(comments)
(measures info)
-
Strategic Action: RC1: Network of conservation & mgmt areas: Implementing a suite of conservation and management tools that ensures a comprehensive representation of the region's biodiversity, provides adequate connectivity for critical ecological processes, improves the health of the conservation targets and abates the region's principal threats will require five major steps: 1) Design of a functional network that incorporates ecological and social connectivity, environmental services, and information about global climate change; 2) Identification of the most appropriate conservation and management tools for each site in the network based on biological, economic, social and political criteria; 3) Achieving the endorsement of environmental and fisheries authorities and civil society for the network; 4) Ensuring efficient management, enforcement and long-term sustainability of the network of sites; and 5) Monitoring of the effectiveness of the network.
(measures info)
Progress Updated Comments On Track - El equipo de TNC y WWF han recaudado fondos para implementar las acciones planeadas para el 2009 y 2010. Se cunetan con responsable sy se estan cumpliendo con las tareas asignadas y productos. - Action Step:
Act Net1.1 Convene a meeting with key partners to agree to work or expand their work into the sites prioritized in the first iteration of the network of conservation and managed areas (2008).
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2008-05-22 - 2008-05-22 Who Override was: DB Diana Bermudez, SC Steve Cox --------------------------------------------------- Convene a meeting with key partners to agree to work or expand their work into the sites prioritized in the first iteration of the network of conservation and managed areas (2008).
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net1.2. Identify and meet with other key actors in the region to align current and future conservation and management strategies and to reach institutional agreements in support of the network of areas (2009).
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 0.0 When Override was: 2009-07-22 - 2009-12-23 Who Override was: DB Diana Bermudez, SC Steve Cox --------------------------------------------------- • Identify and meet with other key actors in the region to align current and future conservation and management strategies and to reach institutional agreements in support of the network of areas (2009).
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
ActNet1.3 Develop a communication strategy and outreach campaign that promotes the importance of the network strategy for engaging key stakeholders using scientific arguments (2010)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2009-12-23 Who Override was: DC Diana Crespo --------------------------------------------------- Develop a communication strategy and outreach campaign that promotes the importance of the network strategy for engaging key stakeholders using scientific arguments (2010)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net1.4 Establish collaboration agreements with key NGOs and institutions working at the site or regional level. Collaboration agreement will define clear objectives, goals, as well as roles and responsabilities that will facilitate the implementation of the network of areas (2010)
(comments)
(measures info)
Comment: Establish collaboration agreements with key NGOs and institutions working at the site or regional level. Collaboration agreement will define clear objectives, goals, as well as roles and responsabilities that will facilitate the implementation of the network of areas (2010)
Progress Updated Comments Planned - - - Action Step:
Act Net2.1 Develop a descriptive document and taxonomy of the conservation and management strategies that currently exist in Mexican legislation (2009)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 60000.0 When Override was: 2009-07-22 - 2010-07-22 Who Override was: ES Enrique Sanjurjo --------------------------------------------------- Develop a descriptive document and taxonomy of the conservation and management strategies that currently exist in Mexican legislation (2009)
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net2.2 Characterize and evaluate the benefits, limitations and feasibility (biological, social, political and economic) of the conservation and management policy tools (2009).
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 20000.0 When Override was: 2009-07-22 - 2010-07-22 Who Override was: ES Enrique Sanjurjo --------------------------------------------------- Characterize and evaluate the benefits, limitations and feasibility (biological, social, political and economic) of the conservation and management policy tools (2009).
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net 2.3 Build databases of network attributes (fichas) to link to a legal tool database (jun 09).
(comments)
Comment: Build databases of network attributes (fichas) to link to a legal tool database (jun 09).
- Action Step:
Act Net 2.4 Build decision tree model and online platform (dec 09)
(comments)
Comment: Build decision tree model and online platform (dec 09)
- Action Step:
Act net2.5. Characterization of attributes of policy instruments (sept 09)
(comments)
Comment: Characterization of attributes of policy instruments (sept 09)
- Action Step:
Act Net2.6 Validate functionality of decision making tool with key users (Dec 09)
(comments)
Comment: Validate functionality of decision making tool with key users (Dec 09)
- Action Step:
Act Net2.7 Finalize the development of a decision making tool to assist the identification of appropriate and feasible policy instruments for each site identified in the conservation and management area network (2010)
(comments)
Comment: Finalize the development of a decision making tool to assist the identification of appropriate and feasible policy instruments for each site identified in the conservation and management area network (2010)
- Action Step:
Act Net3.1 Complete prioritization analysis (2008)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2009-07-22 Who Override was: AG Anne Gondor --------------------------------------------------- Complete prioritization analysis (2008)
Progress Updated Comments Completed Jul 22, 2009 - - Action Step:
Act Net3.2 Complete study of ecological connectivity (2009)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 25000.0 When Override was: 2009-07-22 - 2010-07-22 Who Override was: AG Anne Gondor --------------------------------------------------- Complete study of ecological connectivity (2009)
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net3.3 Compile information on social connectivity (Nov 2009)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 30000.0 When Override was: 2009-07-22 - 2010-07-22 Who Override was: AG Anne Gondor --------------------------------------------------- Compile information on social connectivity (Nov 2009)
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net3.4 Compile information on environmental services generated by the GOC (Feb 2010)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 20000.0 When Override was: 2009-07-22 - 2010-06-22 Who Override was: ES Enrique Sanjurjo --------------------------------------------------- Compile information on environmental services generated by the GOC (Feb 2010)
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net3.5 Complete vulnerability assessment of climate change in the GOC and incorporate into the design of the network (Dec 2009).
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2009-12-23 Who Override was: AG Anne Gondor --------------------------------------------------- Complete vulnerability assessment of climate change in the GOC and incorporate into the design of the network (Dec 2009).
Progress Updated Comments On Track Jul 22, 2009 - - Action Step:
Act Net3.6 Build databases of compiled information of network attributes (fichas) for decision making tool (June 2009)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2009-07-22 Who Override was: AG Anne Gondor --------------------------------------------------- Build databases of compiled information of network attributes (fichas) for decision making tool (June 2009)
Progress Updated Comments Completed Jul 22, 2009 - - Action Step:
Act Net3.7 Integrate preliminary subregional results of ecological and social connectivity, environmental services and climate change vulnerability assessment into network attribute database (Feb 2010).
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2009-07-22 Who Override was: ES Enrique Sanjurjo --------------------------------------------------- Integrate preliminary subregional results of ecological and social connectivity, environmental services and climate change vulnerability assessment into network attribute database (Feb 2010).
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net4.1 Develop a study that estimates the economic value of functional connectivity between mangroves and adjacent ecosystems (2009-2010)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: 79000.0 When Override was: 2009-07-22 - 2010-07-22 Who Override was: --------------------------------------------------- Develop a study that estimates the economic value of functional connectivity between mangroves and adjacent ecosystems (2009-2010)
Progress Updated Comments On Track Jul 22, 2009 aburto - Action Step:
Act Net4.2 Develop a study that estimates the economic value of the network (2010-2012)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2009-07-22 - 2010-07-22 Who Override was: ES Enrique Sanjurjo --------------------------------------------------- Develop a study that estimates the economic value of the network (2010-2012)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net 5.1 Identify institution(s) that has the adequate capacity to lead process to define implementation of the most appropriate conservation and management tool(s) for each site in the network.
(comments)
Comment: Identify institution(s) that has the adequate capacity to lead process to define implementation of the most appropriate conservation and management tool(s) for each site in the network.
- Action Step:
Act Net 5.2 Develop work plans for each site in the network that clearly guides the implementation of the conservation and management tool(s) - objectives, activites, roles and responsibilities, monitoring plan, timelines and budget.
(comments)
Comment: Develop work plans for each site in the network that clearly guides the implementation of the conservation and management tool(s) - objectives, activites, roles and responsibilities, monitoring plan, timelines and budget.
- Action Step:
Act Net 5.3 Identify fundraising strategy to ensure implementation of the conservation and management tool(s)
(comments)
Comment: Identify fundraising strategy to ensure implementation of the conservation and management tool(s)
- Action Step:
Act Net 6.1 With key government agencies and NGOs, run the decision making model to determine which conservation and management policy tools are most appropriate and feasible for each site identified in the network of areas (2010)
(comments)
(measures info)
Comment: With key government agencies and NGOs, run the decision making model to determine which conservation and management policy tools are most appropriate and feasible for each site identified in the network of areas (2010)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net6.2 Develop a policy agenda to promote and create new legal instruments for conservation and management (2009)
(comments)
(measures info)
Comment: Develop a policy agenda to promote and create new legal instruments for conservation and management (2009)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net 6.3 Support the development of justification studies for new conservation and management areas, and lobby for their legal status (2008-2015)
(comments)
(measures info)
Comment: Support the development of justification studies for new conservation and management areas, and lobby for their legal status (2008-2015)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net 6.4 Support the development of land use zoning instruments (2008-2015)
(comments)
(measures info)
Comment: Support the development of land use zoning instruments (2008-2015)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Act Net 6.5 Conduct an evaluation of current fisheries management capacity in the Gulf (2010)
(comments)
(measures info)
Comment: Migrated High Level Estimate: Budget Override was: When Override was: 2010-07-24 - 2010-07-24 Who Override was: --------------------------------------------------- Conduct an evaluation of current fisheries management capacity in the Gulf (2010)
Progress Updated Comments Planned Jul 23, 2009 - Planned Jul 22, 2009 - - Action Step:
Act net 6.6 Support the development of fisheries management plans (2009-2015)
(comments)
(measures info)
Comment: Support the development of fisheries management plans (2009-2015)
Progress Updated Comments Planned Jul 22, 2009 - - Action Step:
Actividad Net7.1 Identify alternatives for establishing no-take zones other than CONAPESCA formal decree (2010)
(comments)
(measures info)
Comment: Identify alternatives for establishing no-take zones other than CONAPESCA formal decree (2010)
Progress Updated Comments Planned - - - Action Step:
Actividad Net 7.2 Support COBI and other local NGOs in the establishment of no-take zones in areas that should have a no-take zone status in the network of 54 priority sites ·
(comments)
(measures info)
Comment: Support COBI and other local NGOs in the establishment of no-take zones in areas that should have a no-take zone status in the network of 54 priority sites ·
Progress Updated Comments Planned - - - Action Step:
Actividad Net 7.3 Support INAPESCA for validating the technical justifications for the decree of no-take zones by CONAPESCA
(comments)
(measures info)
Comment: Support INAPESCA for validating the technical justifications for the decree of no-take zones by CONAPESCA
Progress Updated Comments Planned - - - Action Step:
Actividad Net8.1 Carryout scoping exercise that identifies innovative financial strategy (2009).
(comments)
(measures info)
Comment: Carryout scoping exercise that identifies innovative financial strategy (2009).
Progress Updated Comments Planned - - - Action Step:
Actividad Net 8.2 Develop a financial plan for the entire network of areas (2010-2012)
(comments)
(measures info)
Comment: Develop a financial plan for the entire network of areas (2010-2012)
Progress Updated Comments Planned - - - Action Step:
Actividad net 8.3 Fundraise for the management of the network of areas (2009-2015)
(comments)
(measures info)
Comment: Fundraise for the management of the network of areas (2009-2015)
Progress Updated Comments Planned - - - Action Step:
Actividad Net9a.1 Carryout scoping exercise that identifies innovative financial strategy (2009). ·
(comments)
(measures info)
Comment: Carryout scoping exercise that identifies innovative financial strategy (2009). ·
Progress Updated Comments Planned - - - Action Step:
Actividad 9a.2 Develop a financial plan for the entire network of areas (2010-2012) ·
(comments)
(measures info)
Comment: Develop a financial plan for the entire network of areas (2010-2012) ·
Progress Updated Comments Planned - - - Action Step:
Actividad Net9a.3 Fundraise for the management of the network of areas (2009-2015)
(comments)
(measures info)
Comment: Fundraise for the management of the network of areas (2009-2015)
Progress Updated Comments Planned - - - Action Step:
Actividad Net9b.1 Analyze current evaluations of management effectiveness of existing MPAs in the Gulf of California and generate a roadmap on how MPA management can be improved working in conjunction with CONANP and conservation NGOs (2008)
(comments)
(measures info)
Comment: Analyze current evaluations of management effectiveness of existing MPAs in the Gulf of California and generate a roadmap on how MPA management can be improved working in conjunction with CONANP and conservation NGOs (2008)
Progress Updated Comments Planned - - - Action Step:
Actividad Netb.2 Together with NOAA, design and implement a management capacity building program for MPA managers in the Gulf of California (2009-2011)
(comments)
(measures info)
Comment: Together with NOAA, design and implement a management capacity building program for MPA managers in the Gulf of California (2009-2011)
Progress Updated Comments Planned - - - Action Step:
Actividad Net9b.3 Support the development of site financial plans (2011-2015)
(comments)
(measures info)
Comment: Support the development of site financial plans (2011-2015)
Progress Updated Comments Planned - - - Action Step:
Actividad Net9b.4 Hire an institutional development specialist to strengthen the capacities of local conservation NGOs and government agencies (2009)
(comments)
(measures info)
Comment: Hire an institutional development specialist to strengthen the capacities of local conservation NGOs and government agencies (2009)
Progress Updated Comments Planned - - - Action Step:
Actividad Net 10 Identify existing monitoring efforts, as well as monitoring gaps.
(comments)
Comment: Identify existing monitoring efforts, as well as monitoring gaps.
- Action Step:
Act Net 10.1 Promote the importance of status and effectiveness measures by establishing a learning network among conservation practioners.
(comments)
Comment: Promote the importance of status and effectiveness measures by establishing a learning network among conservation practioners.
- Action Step:
Act Net 10.2 Build capacity among conservation practitioners in order to ensure that they have the knowledge and tools needed to establish measures of success and do adaptive management.
(comments)
Comment: Build capacity among conservation practitioners in order to ensure that they have the knowledge and tools needed to establish measures of success and do adaptive management.
- Action Step:
Act Net 10.3 Standardize monitoring protocols that will allow data comparison and assessing the conservation effectiveness of conservation and management areas in the Gulf of California.
(comments)
Comment: Standardize monitoring protocols that will allow data comparison and assessing the conservation effectiveness of conservation and management areas in the Gulf of California.
- Action Step:
Act Net 10.4 Establish collaboration agreements and coordination mechanisms with key institutions in order to establish a functional monitoring network that measures success at the regional level.
(comments)
Comment: Establish collaboration agreements and coordination mechanisms with key institutions in order to establish a functional monitoring network that measures success at the regional level.
- Action Step:
Act Net 10.5 Report how well strategies and actions are achieving the desired results in order to enhance accountability, credibility and transparency internally and externally.
(comments)
Comment: Report how well strategies and actions are achieving the desired results in order to enhance accountability, credibility and transparency internally and externally.
- Action Step:
Act Net1.1 Convene a meeting with key partners to agree to work or expand their work into the sites prioritized in the first iteration of the network of conservation and managed areas (2008).
(comments)
(measures info)
- Show all:
![]() |
|
-
Indicator: changes in availability of suitable elasmobranch nursery habitat, changes in composition of estuarine dependent fish communities, shift in productivity of shrimp
-
Indicator: Degree of fragmentation of entire river network in the basin from source to sea (basin, river channel and riparian scale)
-
Indicator: Index of Biotic Integrity
-
Indicator: Seasonal distribution of hydrologic regime for characteristic river type(measurement report)Measurement Report:
Measure Date Source Trend Comments - Expert Knowledge Not Specified
![]() |
|
-
Indicator: changes in availability of suitable elasmobranch nursery habitat, changes in composition of estuarine dependent fish communities, shift in productivity of shrimp
-
Indicator: Degree of fragmentation of entire river network in the basin from source to sea (basin, river channel and riparian scale)
-
Indicator: Index of Biotic Integrity
-
Indicator: Seasonal distribution of hydrologic regime for characteristic river type(measurement report)Measurement Report:
Measure Date Source Trend Comments - Expert Knowledge Not Specified
![]() |
|
-
Indicator: % area/shoreline length of unfragmented and type of native habitats, land cover change
-
Indicator: dimensions (length, width from high tide mark and elevation) and configuration (slope and aspect) of areal extent and landuse behind beaches
-
Indicator: presence/absence abundance, ratios of mangrove species
-
Indicator: slope, substrate, landuse behind mangroves and hydrologic flows
![]() |
|
-
Indicator: abundance, recruitment index and species diversity and compostion
![]() |
|
![]() |
|
-
Indicator: Site-specific diversity and abundance indexes(methods)Methods:
-
None
-
None
![]() |
|
-
Indicator: Abundance Index(methods)Methods:
-
Measure the changes over time of the vaquita viability indicators.
-
Measure the changes over time of the vaquita viability indicators.
-
Indicator: Geographical distribution(methods)Methods:
-
Measure the changes over time of the vaquita viability indicators.
-
Measure the changes over time of the vaquita viability indicators.
-
Indicator: Number of vaquitas dead due to entaglement(methods)Methods:
-
Measure the changes over time of the vaquita viability indicators.
-
Measure the changes over time of the vaquita viability indicators.
-
Indicator: Seagrasscoverages as health indicator
-
Indicator: Site-specific diversity and abundance indexes(methods)Methods:
-
None
-
None
![]() |
|
-
Indicator: Abundance Index(methods)Methods:
-
Measure the changes over time of the vaquita viability indicators.
-
Measure the changes over time of the vaquita viability indicators.
-
Indicator: Geographical distribution(methods)Methods:
-
Measure the changes over time of the vaquita viability indicators.
-
Measure the changes over time of the vaquita viability indicators.
-
Indicator: Number of vaquitas dead due to entaglement(methods)Methods:
-
Measure the changes over time of the vaquita viability indicators.
-
Measure the changes over time of the vaquita viability indicators.
-
Indicator: Seagrasscoverages as health indicator
-
Indicator: Site-specific diversity and abundance indexes(methods)Methods:
-
None
-
None
![]() |
|
-
Indicator: # of key stakeholders that have understanded the conectivity of their work at multisite level as part of the * functional network (ecological - social connectivity, environmental services, and global climate change)
-
Indicator: Existence of completed network design(progress report)Progress Report:
Progress Updated Comments On Track Aug 4, 2008 Not Specified
![]() |
|
-
Indicator: # of key stakeholders who understand the economic value of intact ecosystems and a functional network of cons and mgmt areas
![]() |
|
-
Indicator: % of priority sites with adequate legal tools effectively applied and management plan
![]() |
|
-
Indicator: # of conservation practitioners in the network doing adaptive management and improving the practices of conservation
-
Indicator: # of network sites that have analyzed monitoring data changes (status-effectiveness) whit statistical analysis.
-
Indicator: # of network sites whit monitoring plan
-
Indicator: Net10.1a. # priority sites demostrate effective conservation
![]() |
|
-
Indicator: # of conservation practitioners in the network doing adaptive management and improving the practices of conservation
-
Indicator: # of network sites that have analyzed monitoring data changes (status-effectiveness) whit statistical analysis.
-
Indicator: # of network sites whit monitoring plan
-
Indicator: Net10.1a. # priority sites demostrate effective conservation
![]() |
|
-
Indicator: # of sites with effective management and network connectivity
![]() |
|
-
Indicator: Avisos oficiales de modificación de normas y permisos.
-
Indicator: Cuotas permisibles de captura por sitio
-
Indicator: Nº de pescadores que han remplazado artes de pesca tradicionales por selectivas
-
Indicator: Presencia de plan oficial de apertura de temporadas (quienes son los verificadores de las capturas, centros de acopio, mecánica de la temporada cuando se abre o cierra como y donde se va a pescar).
![]() |
|
-
Indicator: Nº barcos camaroneros
-
Indicator: Nº de barcos camaroneros participando en los mercados sustentables
-
Indicator: Tipo de artes de pesca de camarón
![]() |
|
-
Indicator: % priority sites whit out invasive species
-
Indicator: Nº of critical (top 10) invasive species eradicated
![]() |
|
| %Met | Date Updated | Comments |
|---|---|---|
| 0 | Jul 22, 2009 | TNC-WWF performansse (*team activities) Measure and compare number of key partners agree to work or ex or expand their work into network sites |
-
Indicator: # of institutional agreements in support of the network of areas (2009)(progress report)Progress Report:
Progress Updated Comments Planned
-
Indicator: # of key partners who agree to work or expand their work into network sites(methods) (measurement report) (progress report)Methods:
-
Migrated High Level Estimate:
Budget Override was:
When Override was: 2009-07-22 - 2010-07-22
Who Override was: DB Diana Bermudez, SC Steve Cox
---------------------------------------------------
TNC-WWF performansse (*team activities)
Measure and compare number of key partners agree to work or ex
or expand their work into network sites
Measurement Report:Measure Date Source Trend Comments 2 Jul 22, 2009 Rapid Assessment Unknown Progress Report:Progress Updated Comments Planned
-
Migrated High Level Estimate:
-
Indicator: Existence of an agenda for new PAs(methods) (progress report)Methods:
-
Who meassures: TNC and WWF
Progress Report:Progress Updated Comments Planned
-
Who meassures: TNC and WWF
![]() |
|
-
Indicator: # of key users that are familiar with it and have started to utilize it.
-
Indicator: # of sites for which the decision-making model is helpful in determining policy tool(methods)Methods:
-
None
-
None
-
Indicator: Decision making tool created and on line(methods)Methods:
-
None
-
None
![]() |
|
-
Indicator: # of organizations that understand the different conservation and management strategies available and under what conditions to apply each(methods)Methods:
-
Who Measures: TNC and WWF
-
Who Measures: TNC and WWF
-
Indicator: Policy tools Characterization developed
![]() |
|
-
Indicator: # of priority sites whit institutional Collaboration (Agenda - Agreements)
![]() |
|
-
Indicator: % of priority sites with management plans or rules for resource use that has started to monitoring and enforced
![]() |
|
-
Indicator: % of Gulf of California declared no-take zones
![]() |
|
-
Indicator: # of institutions with adequate score
-
Indicator: # of sites with at least 2 years of funding secured for site management
-
Indicator: # of sites with long-term financial plans
-
Indicator: % of the financial needs of the network financed
![]() |
|
-
Indicator: Site-specific diversity and abundance indexes(methods)Methods:
-
None
-
None
-
Indicator: Site-specific number of nesting sites(methods)Methods:
-
None
-
None
![]() |
|
-
Indicator: Site-specific diversity and abundance indexes(methods)Methods:
-
None
-
None
-
Indicator: Site-specific number of nesting sites(methods)Methods:
-
None
-
None
- Show all:
(objectives) (other refs)
- Net10.1 : Communicate network strategy results to key internal and external audiences. : By 2020, TNC and WWF team are demonstrating effectiveness of the network strategy to key internal and external audiences.
- Net10 : Monitoring the effectivenes of the network of conservation and mgmt areas : By 2015, conservation practitioners in the network are using monitoring data to measure their success at the site and multisite level, do adaptive management and improve the practices of conservation in at least 50% of the 54 priority sites.
- IntermediateResult: Network of conservation & mgmt areas whit status and effectivenes measures applied to adapting management
(progress report) (objectives) (other refs)
| Progress | Updated | Comment |
|---|---|---|
| Planned |
- Net1 : key partners participation : By December 2010, institutional collaboration and institutional agreements on conservation and management implementation strategies for the network have been reached.
- IntermediateResult: Key partners buy into vision of functional network
(objectives) (other refs)
- Net9.1 : Institutional capacities : By 2015, at least 50% of the priority sites have a lead institution with adequate capacity to manage the site effectively.
- IntermediateResult: Institutions have capacity to manage areas
(methods) (measurement report) (progress report) (objectives) (other refs)
-
Migrated High Level Estimate:
Budget Override was:
When Override was: 2009-07-22 - 2010-07-22
Who Override was: DB Diana Bermudez, SC Steve Cox
---------------------------------------------------
TNC-WWF performansse (*team activities)
Measure and compare number of key partners agree to work or ex
or expand their work into network sites
| Measure | Date | Source | Trend | Comments |
|---|---|---|---|---|
| 2 | Jul 22, 2009 | Rapid Assessment | Unknown |
| Progress | Updated | Comment |
|---|---|---|
| Planned |
- Net1 : key partners participation : By December 2010, institutional collaboration and institutional agreements on conservation and management implementation strategies for the network have been reached.
- IntermediateResult: Key partners buy into vision of functional network
(objectives) (other refs)
- Net 3 : refined design of the functional network : Objective Net3. By 2010, the refined design of the functional network will incorporate ecological and social connectivity, environmental services, and information about global climate change.
- IntermediateResult: Functional network designed/refined (where & how)
(objectives) (other refs)
- Net 4 : key stakeholders understand the economic value of a functional network of conservation and management areas : Objective Net4. By 2012, key stakeholders understand the economic value of a functional network of conservation and management areas and the value of intact ecological systems.
- IntermediateResult: Ecologic & economic value of natural areas more understood
(objectives) (other refs)
- Net2.1 : decision making tool developed : By May 2010, decision making tool is online and key users are familiar with it and have started to utilize it.
- IntermediateResult: Decision making tool developed
(objectives) (other refs)
- Net10.1 : Communicate network strategy results to key internal and external audiences. : By 2020, TNC and WWF team are demonstrating effectiveness of the network strategy to key internal and external audiences.
- Net10 : Monitoring the effectivenes of the network of conservation and mgmt areas : By 2015, conservation practitioners in the network are using monitoring data to measure their success at the site and multisite level, do adaptive management and improve the practices of conservation in at least 50% of the 54 priority sites.
- IntermediateResult: Network of conservation & mgmt areas whit status and effectivenes measures applied to adapting management
(objectives) (other refs)
- Net10.1 : Communicate network strategy results to key internal and external audiences. : By 2020, TNC and WWF team are demonstrating effectiveness of the network strategy to key internal and external audiences.
- Net10 : Monitoring the effectivenes of the network of conservation and mgmt areas : By 2015, conservation practitioners in the network are using monitoring data to measure their success at the site and multisite level, do adaptive management and improve the practices of conservation in at least 50% of the 54 priority sites.
- IntermediateResult: Network of conservation & mgmt areas whit status and effectivenes measures applied to adapting management
(methods) (objectives) (other refs)
-
Who Measures: TNC and WWF
- Net2 : Policy tools : By September 2009, all of the organizations collaborating on this initiative have a comprehensive understanding of the different conservation and management policy tools currently available in Mexican legislation and their applicability for the Gulf of California.
- IntermediateResult: Policy tools understood
(objectives) (other refs)
- Net5 : Key partners and conservation practitioners BUY IN : By 2012, intersectorial collaboration/cooperation mechanisms have been established between the key stakeholders in order to ensure effective implementation of policy tool(s) at the 16 priority sites.
- IntermediateResult: Site-specific strategies identified for key stakeholders
(objectives) (other refs)
- Net2.1 : decision making tool developed : By May 2010, decision making tool is online and key users are familiar with it and have started to utilize it.
- IntermediateResult: Decision making tool developed
(objectives) (other refs)
- Net9.1 : Institutional capacities : By 2015, at least 50% of the priority sites have a lead institution with adequate capacity to manage the site effectively.
- IntermediateResult: Institutions have capacity to manage areas
(objectives) (other refs)
- Net11 : Priority sites are effectively managed. : By 2018, at least 50% of the priority sites are effectively managed.
- IntermediateResult: Effective management of functional network of sites
(objectives) (other refs)
- Net9.1 : Institutional capacities : By 2015, at least 50% of the priority sites have a lead institution with adequate capacity to manage the site effectively.
- IntermediateResult: Institutions have capacity to manage areas
(objectives) (target kea refs)
- B1 : Shoreline1 : By 2020, the current surface area of rocky shoreline, sandy shoreline (including sea turtle beach nesting sites), mangroves, and non-mangrove wetlands -- at least maintained in their functional condition for supporting critical life habitat in selected priority shoreline sites as compared in 2009. (Target = Shoreline)
-
Shoreline
- Landscape Context: KEA_B1:Shoreline habitat
(objectives) (other refs)
- Net8 : no take zone declared : By 2015, at least 50% of the areas that should have a no-take zone status in the 54 priority sites are no-take zones (informal or formal)
- IntermediateResult: New areas with improved fisheries mgmt
(objectives) (other refs)
- Net 6 : Adequate legal tool effectively applied and a management plan : By 2015, at least 50% of the 54 priority sites have an adequate legal tool effectively applied.
- IntermediateResult: Appropriate legal tools applied to create functional network of sites
(objectives) (other refs)
- Net7 : Efective management plans enforced : By 2015, at least 50% of the 54 priority sites have a management plan (or appropriate rules for resource use) being implemented and enforced.
- IntermediateResult: Effective management plans developed and enforced
(objectives) (other refs)
- Net9.1 : Institutional capacities : By 2015, at least 50% of the priority sites have a lead institution with adequate capacity to manage the site effectively.
- IntermediateResult: Institutions have capacity to manage areas
(objectives) (other refs)
- Net14 : Critical invasive species eliminated : By 2015, the most critical invasive species have been eliminated or reduced until acceptable ecological levels from at least 50% of priority islands in the Gulf (priority islands to be defined, based on species vulnerability, endemics, etc.). (Threat = Invasive Species (cats, dogs, rats))
- ThreatReductionResult: Less iInvasive species
(target kea refs)
-
G. Blue water systems
- Landscape Context: KEA_G1: upwellings, temperature, acidity, surface wind stress
(methods) (objectives)
-
Measure the changes over time of the vaquita viability indicators.
- F1 : Coastal Shallows and soft bottoms1 : By 2020, the diversity and abundance of representative* groups of fishes and demersal and benthic organisms of soft and shallow bottoms at priority sites of the GoC are maintained, in comparison with 2009 (?) baseline levels by ensuring ecological flow and the integrity of the soft bottom. (Target = Coastal shallows and Soft bottoms)
- F2 : Coastal Shallows and soft bottoms2 : By 2020, the vaquita is safe from extinction due to fisheries related threat (Target = Coastal shallows and Soft bottoms)
(objectives) (target kea refs)
- C1 : Rocky reefs and rocky bottoms1 : By 2020, diversity and abundance of reef fish, lobsters, octopuses and sea cucumbers at reefs and rocky bottoms of priority sites are the same or have increased than in 2009* (Target = Rocky reefs and rocky bottoms)
-
Rocky reefs and rocky bottoms
- Landscape Context: KEA_C1: reef fish community, trophic webs influenced by freshwater inflows
(objectives) (other refs)
- Net12 : Reduction of unsustainable fisheries conditions : By 2020, 100% of all unsustainable fisheries conditions (free access, destructive practices, lack of organization) have been eliminated in at least 8 priority sites, and sustainable fisheries practices (selective and modern systems, organized operations, incentives and legal access to fisheries resources and fishing zones) have been adopted. (Threat = Unsustainable Artesanal Fishing)
- ThreatReductionResult: More sustainable artesanal fishing in managed areas
(objectives) (target kea refs)
- A1 : Estuaries1 : By 2020, estuaries at priority sites* in the GoC are ecologically functioning and at least support the same population levels of wetland birds, plants and fish and recruitment levels of marine invertebrate and vertebrate (shrimp, bivalves and snooks) than in 2009 (Target = Estuaries)
- A2 : Estuaries2 : By 2020, critical estuarian nursery habitat of (Anne create sp. list from Villavicencio 2000) shark and ray species are effectively conserved through fisheries management schemes such as seasonal closures, no-take zones or protected areas at priority sites. (Target = Estuaries)
-
Estuaries
- Landscape Context: KEA_A3: Estuarine faunal community, (elasmobranch nursery habitat, fish, shrimp, etc) trophic webs
(objectives) (other refs)
- Net12 : Reduction of unsustainable fisheries conditions : By 2020, 100% of all unsustainable fisheries conditions (free access, destructive practices, lack of organization) have been eliminated in at least 8 priority sites, and sustainable fisheries practices (selective and modern systems, organized operations, incentives and legal access to fisheries resources and fishing zones) have been adopted. (Threat = Unsustainable Artesanal Fishing)
- ThreatReductionResult: More sustainable artesanal fishing in managed areas
(objectives) (other refs)
- Net2.1 : decision making tool developed : By May 2010, decision making tool is online and key users are familiar with it and have started to utilize it.
- IntermediateResult: Decision making tool developed
(objectives) (target kea refs)
- A1 : Estuaries1 : By 2020, estuaries at priority sites* in the GoC are ecologically functioning and at least support the same population levels of wetland birds, plants and fish and recruitment levels of marine invertebrate and vertebrate (shrimp, bivalves and snooks) than in 2009 (Target = Estuaries)
- A2 : Estuaries2 : By 2020, critical estuarian nursery habitat of (Anne create sp. list from Villavicencio 2000) shark and ray species are effectively conserved through fisheries management schemes such as seasonal closures, no-take zones or protected areas at priority sites. (Target = Estuaries)
-
Estuaries
- Condition: KEA_A2:Physical Connectivity of river network(alteration from natural, fragmentation indices, pressure for increased storage, -includes groundwater interaction)
(objectives) (target kea refs)
- B1 : Shoreline1 : By 2020, the current surface area of rocky shoreline, sandy shoreline (including sea turtle beach nesting sites), mangroves, and non-mangrove wetlands -- at least maintained in their functional condition for supporting critical life habitat in selected priority shoreline sites as compared in 2009. (Target = Shoreline)
-
Shoreline
- Landscape Context: KEA_B4: beach physical characteristics-dimension and configuration, temperature, erosion, deposition
(methods) (progress report) (objectives) (other refs)
-
Who meassures: TNC and WWF
| Progress | Updated | Comment |
|---|---|---|
| Planned |
- Net1 : key partners participation : By December 2010, institutional collaboration and institutional agreements on conservation and management implementation strategies for the network have been reached.
- IntermediateResult: Key partners buy into vision of functional network
(progress report) (objectives) (other refs)
| Progress | Updated | Comment |
|---|---|---|
| Not Specified | ||
| On Track | August 04, 2008 |
- Net 3 : refined design of the functional network : Objective Net3. By 2010, the refined design of the functional network will incorporate ecological and social connectivity, environmental services, and information about global climate change.
- IntermediateResult: Functional network designed/refined (where & how)
(methods) (objectives)
-
Measure the changes over time of the vaquita viability indicators.
- F1 : Coastal Shallows and soft bottoms1 : By 2020, the diversity and abundance of representative* groups of fishes and demersal and benthic organisms of soft and shallow bottoms at priority sites of the GoC are maintained, in comparison with 2009 (?) baseline levels by ensuring ecological flow and the integrity of the soft bottom. (Target = Coastal shallows and Soft bottoms)
- F2 : Coastal Shallows and soft bottoms2 : By 2020, the vaquita is safe from extinction due to fisheries related threat (Target = Coastal shallows and Soft bottoms)
(objectives) (target kea refs)
- A1 : Estuaries1 : By 2020, estuaries at priority sites* in the GoC are ecologically functioning and at least support the same population levels of wetland birds, plants and fish and recruitment levels of marine invertebrate and vertebrate (shrimp, bivalves and snooks) than in 2009 (Target = Estuaries)
- A2 : Estuaries2 : By 2020, critical estuarian nursery habitat of (Anne create sp. list from Villavicencio 2000) shark and ray species are effectively conserved through fisheries management schemes such as seasonal closures, no-take zones or protected areas at priority sites. (Target = Estuaries)
-
Estuaries
- Landscape Context: KEA_A4:Wetland bird community
(objectives) (other refs)
- Net10.1 : Communicate network strategy results to key internal and external audiences. : By 2020, TNC and WWF team are demonstrating effectiveness of the network strategy to key internal and external audiences.
- Net10 : Monitoring the effectivenes of the network of conservation and mgmt areas : By 2015, conservation practitioners in the network are using monitoring data to measure their success at the site and multisite level, do adaptive management and improve the practices of conservation in at least 50% of the 54 priority sites.
- IntermediateResult: Network of conservation & mgmt areas whit status and effectivenes measures applied to adapting management
(methods) (objectives)
-
Measure the changes over time of the vaquita viability indicators.
- F1 : Coastal Shallows and soft bottoms1 : By 2020, the diversity and abundance of representative* groups of fishes and demersal and benthic organisms of soft and shallow bottoms at priority sites of the GoC are maintained, in comparison with 2009 (?) baseline levels by ensuring ecological flow and the integrity of the soft bottom. (Target = Coastal shallows and Soft bottoms)
- F2 : Coastal Shallows and soft bottoms2 : By 2020, the vaquita is safe from extinction due to fisheries related threat (Target = Coastal shallows and Soft bottoms)
(objectives) (other refs)
- Net13 : Reduction of unsustainable Industrial fisheries conditions : By 2020, the total volume of the industrial shrimp fleet of the Gulf of California has been reduced by 30% with respect to the 2007 volume (2,000 boats). (Threat = Unsustainable Industrial Fishing)
- ThreatReductionResult: More sustainable industrial fishing in managed areas
(objectives) (other refs)
- Net13 : Reduction of unsustainable Industrial fisheries conditions : By 2020, the total volume of the industrial shrimp fleet of the Gulf of California has been reduced by 30% with respect to the 2007 volume (2,000 boats). (Threat = Unsustainable Industrial Fishing)
- ThreatReductionResult: More sustainable industrial fishing in managed areas
(objectives) (other refs)
- Net12 : Reduction of unsustainable fisheries conditions : By 2020, 100% of all unsustainable fisheries conditions (free access, destructive practices, lack of organization) have been eliminated in at least 8 priority sites, and sustainable fisheries practices (selective and modern systems, organized operations, incentives and legal access to fisheries resources and fishing zones) have been adopted. (Threat = Unsustainable Artesanal Fishing)
- ThreatReductionResult: More sustainable artesanal fishing in managed areas
(objectives) (other refs)
- Net14 : Critical invasive species eliminated : By 2015, the most critical invasive species have been eliminated or reduced until acceptable ecological levels from at least 50% of priority islands in the Gulf (priority islands to be defined, based on species vulnerability, endemics, etc.). (Threat = Invasive Species (cats, dogs, rats))
- ThreatReductionResult: Less iInvasive species
(objectives) (other refs)
- Net2 : Policy tools : By September 2009, all of the organizations collaborating on this initiative have a comprehensive understanding of the different conservation and management policy tools currently available in Mexican legislation and their applicability for the Gulf of California.
- IntermediateResult: Policy tools understood
(objectives) (target kea refs)
- B1 : Shoreline1 : By 2020, the current surface area of rocky shoreline, sandy shoreline (including sea turtle beach nesting sites), mangroves, and non-mangrove wetlands -- at least maintained in their functional condition for supporting critical life habitat in selected priority shoreline sites as compared in 2009. (Target = Shoreline)
-
Shoreline
- Landscape Context: KEA_B2: species composition
(objectives) (other refs)
- Net12 : Reduction of unsustainable fisheries conditions : By 2020, 100% of all unsustainable fisheries conditions (free access, destructive practices, lack of organization) have been eliminated in at least 8 priority sites, and sustainable fisheries practices (selective and modern systems, organized operations, incentives and legal access to fisheries resources and fishing zones) have been adopted. (Threat = Unsustainable Artesanal Fishing)
- ThreatReductionResult: More sustainable artesanal fishing in managed areas
(objectives)
- F1 : Coastal Shallows and soft bottoms1 : By 2020, the diversity and abundance of representative* groups of fishes and demersal and benthic organisms of soft and shallow bottoms at priority sites of the GoC are maintained, in comparison with 2009 (?) baseline levels by ensuring ecological flow and the integrity of the soft bottom. (Target = Coastal shallows and Soft bottoms)
- F2 : Coastal Shallows and soft bottoms2 : By 2020, the vaquita is safe from extinction due to fisheries related threat (Target = Coastal shallows and Soft bottoms)
(measurement report) (objectives) (target kea refs)
| Measure | Date | Source | Trend | Comments |
|---|---|---|---|---|
| Expert Knowledge | Not Specified |
- A1 : Estuaries1 : By 2020, estuaries at priority sites* in the GoC are ecologically functioning and at least support the same population levels of wetland birds, plants and fish and recruitment levels of marine invertebrate and vertebrate (shrimp, bivalves and snooks) than in 2009 (Target = Estuaries)
- A2 : Estuaries2 : By 2020, critical estuarian nursery habitat of (Anne create sp. list from Villavicencio 2000) shark and ray species are effectively conserved through fisheries management schemes such as seasonal closures, no-take zones or protected areas at priority sites. (Target = Estuaries)
-
Estuaries
- Landscape Context: KEA_A1:Hydrologic regime, combined surface and groundwater regime
(objectives)
- Insular species - Nesting Bird1 : By 2020, nesting bird abundance and number of nesting sites at priority sites is the same than in 2009* (Target = Insular Species)
- Insular species - Nesting Bird2 : By 2020, the abundance of Myotis vivesi at priority sites is the same than in 2009*. (Target = Insular Species)
- E1 : Seamounts1 : By 2020, diversity and abundance of pelagic fish assemblages at seamounts associated to priority sites are the same than in 2009 (Target = Seamounts)
- F1 : Coastal Shallows and soft bottoms1 : By 2020, the diversity and abundance of representative* groups of fishes and demersal and benthic organisms of soft and shallow bottoms at priority sites of the GoC are maintained, in comparison with 2009 (?) baseline levels by ensuring ecological flow and the integrity of the soft bottom. (Target = Coastal shallows and Soft bottoms)
- F2 : Coastal Shallows and soft bottoms2 : By 2020, the vaquita is safe from extinction due to fisheries related threat (Target = Coastal shallows and Soft bottoms)
(objectives)
- Insular species - Nesting Bird1 : By 2020, nesting bird abundance and number of nesting sites at priority sites is the same than in 2009* (Target = Insular Species)
- Insular species - Nesting Bird2 : By 2020, the abundance of Myotis vivesi at priority sites is the same than in 2009*. (Target = Insular Species)
(objectives) (target kea refs)
- B1 : Shoreline1 : By 2020, the current surface area of rocky shoreline, sandy shoreline (including sea turtle beach nesting sites), mangroves, and non-mangrove wetlands -- at least maintained in their functional condition for supporting critical life habitat in selected priority shoreline sites as compared in 2009. (Target = Shoreline)
-
Shoreline
- Landscape Context: KEA_B3: Erosion and rate of deposition regime, tidal range, periodicity, sediment accretion rate, slope, substrate
(objectives) (other refs)
- Net13 : Reduction of unsustainable Industrial fisheries conditions : By 2020, the total volume of the industrial shrimp fleet of the Gulf of California has been reduced by 30% with respect to the 2007 volume (2,000 boats). (Threat = Unsustainable Industrial Fishing)
- ThreatReductionResult: More sustainable industrial fishing in managed areas
(target kea refs)
-
H. Groundwater dependent wetlands (oases, springs, marshes, vernal pools)
- Landscape Context: KEA_H1: hydrologic regime
Help regarding this issue can be found in the CAP Workbook instructions and on ConserveOnline at:
http://conserveonline.org/workspaces/cbdgateway/cap/resources
- Download the latest CAP Excel Workbook.
- Download the ConPro Data Pack now!
Notes:
- It is always a good idea to use the latest CAP Excel workbook!
- You may see a "File Error: Data may have been lost" message when opening a Data Pack that was downloaded from ConPro. Please ignore this warning.
This data is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 3.0 United States License